Skip to content
Tradie Forms
Features
Pricing
  • Electrical in NSW
  • Electrical in VIC
  • Electrical in QLD
  • Electrical in WA
  • Electrical in SA
  • Electrical in TAS
  • Electrical in ACT
  • Electrical in NT
  • Plumbing in NSW
  • Plumbing in QLD
  • Plumbing in SA
  • Plumbing in TAS
  • Gasfitting in TAS
  • Gasfitting in NT
  • Building in NSW
  • Building in VIC
  • Building in QLD
  • Fire Safety in NSW
  • Fire Safety in QLD
  • Pest Control in VIC
  • Pest Control in WA
  • ACMA TCA1
  • NSW Fire Safety Statement
  • NSW Combined Notice
  • QLD CoTC
  • QLD Form 9
  • Browse all forms
  • AI assistant
  • PDF tools
  • Integrations
  • Guides
  • Documentation
Log inCreate form

Australian trade form guides

Practical guides for compliance forms, safety paperwork, testing records, handovers, and digital paperwork across Australian states and trades. Start with the form on site, catch the gaps, and download the PDF layout your customer or regulator expects.

Browse trade formsSee how it works

Featured guides

Practical reads for tradies who want the form finished before the next job.

Take 5 form
Compliance

How to complete a Take 5 safety check on site

Building

Run a Take 5 before tools come out. Worker and task details, ten checks, hazard rows that mean something, then a signed PDF for the job file.

01 Sept 20267 min read
Read
NSW Fire Safety Certificate form
Compliance

How to complete a NSW fire safety certificate on site

NSW · Fire Safety

Fill a NSW final or interim fire safety certificate on site, from building and measure details to the declarant check, preview and PDF download.

25 Aug 20267 min read
Read
JSA form
Compliance

How to write a JSA on site

Building

Write a site-specific JSA before tools come out: real steps, honest hazards and controls, crew sign-on after a walk-through, then a clean PDF for the pack.

04 Aug 20266 min read
Read

Browse all resources

Filter by state, trade, form type, or paperwork problem.

NSW Combined Notice form
Compliance

When to submit a NSW Combined Notice of Work and Certificate of Compliance

NSW · Plumbing

NSW plumbing timing guide: Notice of Work before starting, Certificate of Compliance at completion, inspection pathways, and when the combined form is used.

03 Sept 202612 min read
Read
Take 5 form
Record keeping

7 Take 5 records principals ask for after a near miss

Building

Seven Take 5 records principals and safety advisors ask for after a near miss: dated PDFs, naming, storage, SWMS links, and what not to invent.

03 Sept 20268 min read
Read
NSW Combined Notice form
Compliance

Common mistakes on the NSW Combined Notice and Certificate of Compliance

NSW · Plumbing

Field checks for NSW plumbers before downloading the Combined Notice of Work and Certificate of Compliance, from pathway mix-ups to vague work descriptions.

01 Sept 202610 min read
Read
Take 5 form
Compliance

How to complete a Take 5 safety check on site

Building

Run a Take 5 before tools come out. Worker and task details, ten checks, hazard rows that mean something, then a signed PDF for the job file.

01 Sept 20267 min read
Read
Take 5 form
Compliance

9 Take 5 shortcuts that fail toolbox audits

Building

Nine Take 5 timing and honesty shortcuts that fail toolbox audits: after-the-fact cards, tick and flick, open Nos, and Take 5 when the pack needed a SWMS.

27 Aug 20267 min read
Read
Take 5 form
Record keeping

Digital vs paper Take 5 for site crews

Building

Compare paper Take 5 pads with digital Take 5 PDFs on the phone. On-site completion, filing, principal handover, and when each approach still works.

27 Aug 20269 min read
Read
NSW Fire Safety Certificate form
Compliance

How to complete a NSW fire safety certificate on site

NSW · Fire Safety

Fill a NSW final or interim fire safety certificate on site, from building and measure details to the declarant check, preview and PDF download.

25 Aug 20267 min read
Read
Take 5 form
Compliance

When to use a Take 5 pre-task check

Building

If-then checklist: when a Take 5 is enough, when you still need a JSA or SWMS, and what to do when conditions change mid-shift.

25 Aug 20268 min read
Read
NSW Fire Safety Certificate form
Compliance

Common mistakes on NSW fire safety certificates

NSW · Fire Safety

Fix NSW fire safety certificate mistakes before download: wrong final vs interim type, schedule mismatch, weak measure rows, and missing owner details.

20 Aug 20267 min read
Read
NSW Fire Safety Certificate form
Compliance

When is a NSW fire safety certificate required

NSW · Fire Safety

When NSW needs a final or interim fire safety certificate, how it differs from the annual fire safety statement, and what to check before issuing.

20 Aug 20268 min read
Read
QLD CoTC form
Compliance

QLD CoTC 5-year file: what to keep and who needs it

QLD · Electrical

Queensland CoTC five-year record checklist: contractor copy, customer handover, naming, supporting notes, corrections, and who gets which PDF.

18 Aug 20268 min read
Read
QLD CoTC form
Compliance

QLD CoTC vs NSW CCEW for electricians working across states

QLD · Electrical

A careful comparison of Queensland certificates of testing and compliance and NSW CCEW duties, including the BCNSW eCert submission path from 1 July 2026.

18 Aug 202611 min read
Read

Showing 1-12 of 120 resources

  • 1
  • 2
  • …
  • 10

Guide collections

By state
NSW trade form guidesQLD trade form guidesTAS trade form guidesVIC trade form guides
By trade
Building compliance form guidesElectrical compliance form guidesFire Safety compliance form guidesPlumbing compliance form guides
By form
ACMA TCA1 guidesJSA guidesTake 5 guidesNSW CCEW guidesNSW Fire Safety Certificate guidesNSW Fire Safety Statement guidesNSW WHS SWMS guidesQLD CoTC guides

Template hubs

By state
NSWVICQLDWASATASACTNT
By trade
ElectricalPlumbingGasfittingBuildingFire SafetyPest Control
Tradie Forms

Fill Australian trade forms on your phone at the job, with gaps flagged before you download clean PDFs on the official layout. Built for sparkies, plumbers, builders, and crews.

Theme

Product

  • Features
  • Pricing
  • AI assistant
  • PDF tools
  • Integrations
  • Custom forms

Trades

  • Electrical
  • Plumbing
  • Gasfitting
  • Building
  • Fire Safety
  • Pest Control

Explore

  • Forms
  • Guides
  • Documentation
  • About
  • Contact

Account

  • Log in
  • Sign up

Legal

  • Terms of service
  • Privacy policy

© 2026 Tradie Forms Australia. All rights reserved.

2
10
2026
NSW WHS SWMS form
Compliance

NSW WHS site pack with SWMS risk assessment and toolbox talks

NSW · Building

How SafeWork NSW HIISP Forms 04, 05, and 06 work together on residential sites: risk assessment, SWMS for high risk work, and toolbox talk records.

24 July 20267 min read
Read
ACMA TCA2 form
Compliance

How to fill out the ACMA TCA2 cabling advice form

Electrical

How registered cablers complete ACMA TCA2, record outstanding cabling matters, set priority, finish on site and download the PDF.

23 July 20268 min read
Read
Defect Notice form
Safety

Electrical defect notice template

Electrical

How electricians record an unsafe or non-compliant installation, what an electrical defect notice should include, and how to fill and download the PDF on site.

23 July 20269 min read
Read
Emergency Lighting Register form
Record keeping

Emergency lighting test register and AS 2293.2

Electrical

How to keep an emergency and exit light test register to AS/NZS 2293.2, what the six-monthly discharge test covers, and how to fill it and download the PDF.

23 July 20269 min read
Read
NSW WHS Test and Tag Register form
Record keeping

NSW WHS Form 08 test and tag register

NSW · Electrical

Complete SafeWork NSW WHS Form 08 on site, record every electrical test and tag result, and download a clean, audit-ready register PDF.

23 July 202610 min read
Read
NT CoC Addendum form
Compliance

NT electrical CoC addendum for solar and EV

NT · Electrical

When NT electricians need the certificate of compliance addendum for battery, EV, solar and inverter work, what to record, and who to send it to.

23 July 20269 min read
Read
NT Emergency Repairs CoC form
Compliance

NT after-hours electrical repairs CoC guide

NT · Electrical

How the NT emergency after-hours electrical repairs certificate of compliance works, who signs it, and why you still lodge the online CoC. Fill it on site.

23 July 20269 min read
Read
QLD Form 26 form
Compliance

QLD Form 26 pool safety nonconformity notice

QLD · Building

How QLD Form 26 pool safety nonconformity notices work: who issues one, the 2 business day and 3 month timeframes, and what it must say. Fill it on site.

23 July 202611 min read
Read
QLD Form 36 form
Compliance

QLD Form 36 no pool safety certificate notice

QLD · Building

When you sell or lease a QLD property with a pool but no current pool safety certificate, Form 36 is the notice you lodge. Fill it on site, download the PDF.

23 July 20269 min read
Read
QLD Form 5 form
Record keeping

QLD Form 5 testing report records and handover

QLD · Plumbing

Who prepares the QLD Form 5 testing or commissioning report, the 5 and 10 business day handover chain, and how to keep clean records for council.

23 July 20268 min read
Read
QLD Form 6 form
Compliance

QLD Form 6 remote area compliance notice

QLD · Plumbing

How the QLD Form 6 remote area compliance notice works, who signs it, and the 10 business day deadline to give it to council. Fill it on site, download the PDF.

23 July 20269 min read
Read
Smoke Alarm Record form
Record keeping

Smoke alarm service record template

Electrical

How to log a smoke alarm service: each alarm, its power source, pass or fail, and the AS 3786 rules behind it. Fill it on site and download the PDF.

23 July 20269 min read
Read

Showing 25-36 of 120 resources

  • 1
  • 2
  • 3
  • 4
  • …
  • 10
1
2
4
10