Australian trade form guides
Practical guides for compliance forms, safety paperwork, testing records, handovers, and digital paperwork across Australian states and trades. Start with the form on site, catch the gaps, and download the PDF layout your customer or regulator expects.
Featured guides
Practical reads for tradies who want the form finished before the next job.
Browse all resources
Filter by state, trade, form type, or paperwork problem.

Common test and tag register mistakes
Electrical
Test and tag register errors that fail audits: vague asset IDs, missing next due dates, fails with no action, wrong intervals, and writing up from memory.

RCD test record on-site guide
Electrical
Complete an RCD test record on site with push-button and trip-time results, failed-item actions, sign-off and a clean PDF for the client.

Construction site test and tag every three months
Electrical
How AS/NZS 3012 three-month testing works on construction and demolition sites, what the register must show, and how it sits with AS/NZS 3760 methods.

Test and tag register on-site guide
Electrical
How to complete a test and tag register on site: set environment and intervals once, add each item as you test it, record fails, and download a signed PDF.

ACMA TCA2 record keeping and customer handover
Electrical
How registered cablers hand over the ACMA TCA2, keep job copies, pair it with the TCA1, and store outstanding matters advice with the site record.

When is an ACMA TCA2 required
Electrical
When registered cablers use the ACMA TCA2 outstanding matters form, how it differs from the mandatory TCA1, and when to issue pre works or post works advice.

Common ACMA TCA2 mistakes registered cablers make
Electrical
Avoid TCA2 mistakes: treating it as a TCA1, wrong pre vs post works, missing priorities, vague outstanding matters, and no customer copy.

NSW Combined Notice vs sewer service diagram
NSW · Plumbing
See why NSW plumbers need both the Combined Notice and Certificate of Compliance and a sewer service diagram, plus how to hand over each record.

When to submit a NSW Combined Notice of Work and Certificate of Compliance
NSW · Plumbing
NSW plumbing timing guide: Notice of Work before starting, Certificate of Compliance at completion, inspection pathways, and when the combined form is used.

7 Take 5 records principals ask for after a near miss
Building
Seven Take 5 records principals and safety advisors ask for after a near miss: dated PDFs, naming, storage, SWMS links, and what not to invent.

Common mistakes on the NSW Combined Notice and Certificate of Compliance
NSW · Plumbing
Field checks for NSW plumbers before downloading the Combined Notice of Work and Certificate of Compliance, from pathway mix-ups to vague work descriptions.

How to complete a Take 5 safety check on site
Building
Run a Take 5 before tools come out. Worker and task details, ten checks, hazard rows that mean something, then a signed PDF for the job file.
Showing 1-12 of 128 resources



