
Service Report
National · Completion
Record the work completed, tick through the handover, list anything outstanding, and capture customer acceptance on your phone.
A clear sign-off now beats an argument about the scope three weeks later.

A job handover records the work completed, the practical handover steps, and any loose ends before the job is closed. This is a Tradie Forms customer record, not a compliance certificate.
Vague handovers leave room for scope disputes, delayed invoices, and loose ends nobody owns.
Write down what was completed and what the customer saw before memories and expectations drift.
Give each outstanding item an owner and timeframe so a small loose end does not swallow the whole handover.
A short checklist makes the practical parts of handover visible before everyone leaves the site.
Three steps before the keys and final invoice move on.
Start a fresh one from the library or pick up a draft where you left off.
Business and customer, completed works, handover checks, outstanding items, then acceptance.
Your business and job reference.
Customer contact and site address.
Description of works and completion date.
Handover checklist and outstanding items.
Tradie sign-off and optional customer acceptance.
Preview the PDF, walk through the work and loose ends, then capture signatures when everyone agrees with the record.
The technical details that prove what was completed or checked.
Signatures, declarations, authorised people, and review steps.
Anything else that should be checked before downloading the PDF.
Open the form, walk through the work, and leave with the loose ends and sign-off in writing.
Nearby templates for the same state, trade, or paperwork type.
Open the guide, browse the catalogue, or send a PDF we can map.