Review the PDF before download
QLD Form 1 permit applications ready for council
Apply for plumbing, drainage and on-site sewerage permit work in the Queensland PDF order.
Lodge the finished form with council before you roll to the next job, not a half-filled form tonight.
QLD Form 1
Queensland Government
Customer & site
Installer
Saved detailTests & results
Certification
Date of test
28 May 2026
Ready to export
Validation passed · ready to export
All changes saved
Saved details prefilled
Licence & business
PDF exported
Attached to job
Preview the QLD Form 1 PDF before you export
Fill the guided sections, then check the finished PDF layout before you download, send, or hand it over.

Hand over the layout people expect
Keep a clean copy for the job record
What you fill in
Four guided groups across twelve PDF sections.
Land and Permit
Site description and permit work types.
Classification and Application
Building class and fast-track eligibility.
Site Conditions
Soil class, fixtures, water supply, and wastewater disposal.
Parties and Declaration
Owner, applicant, and declaration.
Permit paperwork steals hours from the tools
What slows QLD plumbers down before council accepts the application.
Same site and owner details every lodge
Street address, lot and plan, and owner contact should carry over from your last Form 1 on that job.
Yes/No tables buried in a flat PDF
Permit types, fast-track questions, and soil class grids are easy to miss on a phone PDF viewer.
Council wants the PDF in order
Generic PDF editors do not match the Plumbing and Drainage Regulation 2019 Form 1 field order.
Form 1 lodged before you leave site
Three steps at the job or in the van.
Open the form
Open the form on your phone or laptop. Sign in later if you want cloud drafts across devices.
Matches the Queensland Government Form 1 layout (Version 1, July 2019).
Fill each section online at the job
Work through permit types, site conditions, fixtures, and disposal details in the same order as the PDF.
Saved applicant details cut repeat typing on the next lodge.
Export and lodge
Download the official PDF and submit to your local government with any required attachments.
Attach soil classification or site evaluation reports where the form requires them.
Built for QLD permit work
Twelve guided sections
Land, permit types, building class, soil and fixtures, disposal, owner, applicant, and declaration in PDF order.
Applicant details
Save company and contact details and apply them on the next Form 1.
Validation while you fill
Missing declaration date and key fields surface before export, not after council rejects the lodge.
PDF ready to hand over
Download the filled Form 1 ready for your local government.
Before you export
Tradie Forms checks these requirements against the Queensland Government template.
- Declaration date is required before export.
- Attach supporting reports where the form requires soil classification or site evaluation.
Frequently asked questions
Guides for QLD Form 1
Compliance and workflow articles matched to this form.
Start your QLD Form 1 permit application
Fill online at the job. Export the official PDF when you are ready to lodge.

