Queensland Government · Live template

QLD Form 21 final inspection certificates ready for export

Complete the final inspection certificate for class 1a and class 10 building work and export the Queensland PDF.

Give the owner a signed Form 21 before you leave site, not a half-filled PDF tonight.

More forms for QLD builders

Exports the Form 21 PDF
Eight guided sections in PDF order
Certifier details saved for the next job
9:41

QLD Form 21

Queensland Government

Draft
OwnerBuildingCertificatioCertifier

Customer & site

Installer

Saved detail

Licence no.-Verified

Tests & results

Polarity correct-
Earth continuity-
RCD trip time (ms)Pass

Certification

Date of test

28 May 2026

Ready to export

Validation passed · ready to export

All changes saved

Export PDF

Saved details prefilled

Licence & business

PDF exported

Attached to job

Preview the QLD Form 21 PDF before you export

Fill the guided sections, then check the finished PDF layout before you download, send, or hand it over.

QLD Form 21 form preview
Preview of the QLD Form 21 Final Inspection Certificate PDF layout used for export.

Review the PDF before download

Hand over the layout people expect

Keep a clean copy for the job record

What you fill in

Four guided groups across eight PDF sections.

  1. Owner and Property

    Owner correspondence details, street address, lot and plan, and local government area.

  2. Building and Approval

    Building description, NCC class, and building development approval numbers.

  3. Certification

    Performance requirements and stage inspection and certificate dates.

  4. Certifier and Signature

    Your licence, contact details, signature, and date.

Final certificates slow down the handover

What trips up building certifiers before the owner gets the paperwork.

Same certifier details every job

Name, licence, company, and postal address should carry over when you issue the next final inspection certificate.

Stage dates buried in a flat PDF

Foundation, slab, frame, and final inspection dates are easy to miss on a phone PDF viewer.

Owners and councils expect the PDF in order

Generic PDF editors do not match the Building Act 1975 Form 21 field order.

Form 21 finished before you leave site

Three steps at the job or in the van.

Open the form

Open the form on your phone or laptop. Sign in later if you want cloud drafts across devices.

Matches the Queensland Government Form 21 layout (Version 1, September 2021).

Fill each section online

Work through owner and property details, stage certification dates, and your certifier details in PDF order.

Saved certifier details cut repeat typing on the next final inspection.

Export and hand over

Sign, download the official PDF, and give it to the owner within five business days of the final inspection.

Lodge details with the QBCC commissioner as required for your project.

Built for QLD final inspections

Eight guided sections

Owner, property, building, approval, performance, certification stages, certifier, and signature in PDF order.

Certifier and owner details

Save certifier licence and contact details, and owner postal address, for the next certificate.

Validation while you fill

Missing licence, signature, or date surface before export, not after the owner chases you.

PDF ready to hand over

Download the filled Form 21 ready for the owner and your records.

Before you export

Tradie Forms checks these requirements against the Queensland Government template.

  • Building certifier name and licence number are required before export.
  • Signature and date are required before export.

Frequently asked questions

Built for Australian tradies

Start your QLD Form 21 final inspection certificate

Fill online at the job. Export the official PDF when you are ready to hand over.

No credit card required
3 free PDF exports per month