Form guides
Meters
Meters, load, and supply on the NSW CCEW
Meter installs, removals, and load figures for the network. You can add up to 8 meters per cert.
Meter management
When replacing meters, add both the old meter (status: "Removed") and new meter (status: "Installed") to maintain complete installation records.
Adding and managing meters
Add meters
Click Add Meter for each meter on the job (up to 8).
Set meter status
For each meter, select the appropriate status:
- Installed: New meters added during the work
- Removed: Existing meters removed during the work
- Existing: Meters already present and unchanged
Remove unnecessary entries
Use the "Remove" button in the top-right corner of any meter card to delete unwanted entries.
Meter specification details
For each meter entry, provide the following information:
Identification
- Meter Number: Physical meter serial number
- Register Number: Specific register identification
- No. of Dials: Total number of reading dials
Configuration
- Master/Sub Status: M (Master), S (Sub), or N (None)
- Wired as Master/Sub: Physical wiring configuration
- Tariff: Rate code (e.g., T11, T31, T33)
Common tariff codes
Understanding tariff codes helps ensure accurate billing setup:
- T11: General domestic supply (single rate)
- T31: Off-peak hot water heating
- T33: Controlled load (pool pumps, storage heating)
- T20: Small business single rate
- T22: Demand-based commercial rates
- T41: Large commercial/industrial supply
Meter Reading: Record the current reading for billing continuity and consumption tracking.
Load and supply assessment
Load calculation requirements
Accurate load assessment ensures grid stability and compliance with network capacity:
Calculate additional load
Estimated Increase in Load (A/ph): Calculate the additional electrical load in Amps per phase from new installations.
Include all new appliances, lighting, and equipment in your load calculation.
Assess existing capacity
Is increased load within capacity? Evaluate whether existing electrical service can handle additional load:
- Yes: Current installation/service capacity is adequate
- No: Service upgrade or load management may be required
Exceeding service capacity can cause safety hazards and compliance issues.
Document connection status
Is work connected to supply? Indicate current energisation status:
- Yes: New work is connected and operational
- No: Work awaits network operator inspection/connection
Complete Installation work types first so meter requirements are clear before filling this section.
Installer section
Installer licence and business details.

