Form guides

Fixtures to Be Installed

Fixture counts for the permit work application

Use this section to count the fixtures to be installed.

What to enter

  • Enter the number beside each fixture type being installed
  • Use zero or leave blank only where the form and your workflow allow it
  • Use the comments section for unusual fixtures or context

Tips

Count from the plans and scope, not memory. If the fixture schedule changes, update the form before lodging.

Before export

Check totals against the plumbing plan and quote.

Was this page helpful?

On this page