Form guides
Fixtures to Be Installed
Fixture counts for the permit work application
Use this section to count the fixtures to be installed.
What to enter
- Enter the number beside each fixture type being installed
- Use zero or leave blank only where the form and your workflow allow it
- Use the comments section for unusual fixtures or context
Tips
Count from the plans and scope, not memory. If the fixture schedule changes, update the form before lodging.
Before export
Check totals against the plumbing plan and quote.
Was this page helpful?

