Skip to content
Tradie Forms
Contact supportOpen app
Tradie Forms
IntroductionQuick startFAQ

Using the app

Form typesWorkspaceJobsStarting a formCompleting a formAI assistantPDF downloadsShare links
Presets
PDF toolsTeamsCustom forms

Form guides

Overview

Account and billing

Managing your accountBilling

Support

TroubleshootingFeedback
Section
Section
Page title
Page title
Short description for the help article
Description continues on a second line
Short description for the help article
Description continues on a second line
Intro paragraph
Intro paragraph
Intro paragraph
Intro paragraph
Intro paragraph
Intro paragraph
Section heading
Section heading
Body paragraph
Body paragraph
Body paragraph
Body paragraph
Body paragraph
Body paragraph
Note
Callout title
Callout body
Callout body
Note
Callout title
Callout body
Callout body
Another heading
Another heading
Body paragraph
Body paragraph
Body paragraph
Body paragraph
Body paragraph
Body paragraph
List item one
List item two
List item three
List item one
List item two
List item three
Was this page helpful?
Was this page helpful?
Yes
Yes
No
No

Loading documentation page

On this page
On this page
TOC item
TOC item
TOC item
TOC item
TOC item
TOC item
TOC item
TOC item
TOC item
TOC item

Form guides

Test report

Test fields in an existing draft from the retired Tradie Forms NSW CCEW

Record the tests you actually did on site. Tick a test only if you performed it with the right equipment and the standards that apply to your work.

The Tradie Forms CCEW is retired and direct eCert lodgement is not supported. Use these labels only to understand an existing draft, then complete the current CCEW in the BCNSW portal.

Test date and timing

The test date should reflect when safety tests were actually performed:

Select test date

Use the calendar picker or quick buttons ("Yesterday", "Today") to set the test date.

Timing considerations

Complete testing before certifying the installation so the report matches the final condition of the job.

Plan testing as the final step before energisation to capture the installation's true condition.

The draft does not accept a future test date. Pick the actual date the tests were completed, not the eCert submission date unless they coincide.

The person who performed the tests must submit the CCEW as soon as possible and no later than seven days after completing them.

Safety tests

Use "Check All" only when every listed test applies and was completed. Otherwise, choose the individual tests that match the job.

Electrical safety tests

Earthing system integrity

Records earthing continuity and connection checks.

Residual current device operational

Records RCD or safety switch operation checks.

Installation verification tests

Insulation resistance (MΩ)

Records conductor insulation resistance readings. Use the threshold that applies to the job and standard.

Visual check suitability of installation

Records the visual inspection of equipment, environment, wiring, and visible defects.

Polarity verification

Records active, neutral, and earth connection checks.

Specialised system tests

Stand-alone system compliance

Records checks for off-grid or isolated power systems where they apply.

Connection integrity

Records connection and termination checks.

Fault loop impedance

Records fault loop impedance readings where this test applies.

Test using calibrated equipment and the standards that apply to the installation.

Record values from your test instruments, not rounded guesses. Regulators and customers may compare readings to site reports.

Certification section

Declaration and current eCert submission.

Was this page helpful?

On this page

Test date and timingSelect test dateTiming considerationsSafety testsElectrical safety testsInstallation verification testsSpecialised system tests