Overview and section help for Queensland Form 1 permit work applications

Queensland Government
Permit work application for plumbing, drainage and on-site sewerage work under the Plumbing and Drainage Regulation 2019.
Open this formQLD Form 1 is used to apply for permit work for plumbing, drainage, and on-site sewerage work in Queensland.
Tradie Forms follows the form section order and maps your answers to the PDF layout.
Open the form when you have the plans and supporting documents ready.
Have these ready:
Permit work needs a permit before it starts. Local governments can require supporting documents with the application, depending on the building class and proposed work. Check the current council and Queensland Government requirements before lodging.
Use this section to identify the land covered by the application.
On Solo or Team, use address search to start the address, then check the manual fields. Address search will not always know lot, plan, tenancy, or level details.
Check the site details against the permit paperwork and any plans you are lodging.
Use this section to say what kind of permit work is being applied for.
Match the wording to the plans and supporting documents you will lodge. If the work includes water supply and drainage, make sure both are covered.
Check that the selected work type matches the actual scope and the documents attached to the application.
Enter the National Construction Code building class for the building or structure.
Different supporting documents can apply to different building classes. If you are unsure, confirm with the builder, designer, certifier, or local government before lodging.
Check the building class against the application documents. A wrong class can lead to wrong supporting paperwork.
Use this section to answer the application type questions.
Fast-track processing depends on the work and supporting material, not just the checkbox. Check the local government process before relying on fast-track timing.
Make sure every yes/no answer matches the actual application and attached documents.
Enter the soil classification when the application requires it.
Some soil classes can trigger extra design details, such as articulation for sanitary drainage. Check the application requirements for the job and building class.
Do not guess the soil class. Use the report or confirm before lodging.
Use this section to count the fixtures to be installed.
Count from the plans and scope, not memory. If the fixture schedule changes, update the form before lodging.
Check totals against the plumbing plan and quote.
Use this section to describe the water supply work in the application.
Make sure the water supply selection lines up with the permit work type and plans.
Check water service details against the site plan and any water service provider requirements.
Use this section when wastewater disposal details are part of the application.
For on-site sewerage work, supporting documents can be important. Check approval and report requirements before lodging.
Make sure disposal details match the design documents and site conditions.
Use comments for details that do not fit cleanly in another section.
Keep comments short and specific. Do not use this section to hide missing required information from another section.
Enter the owner details for the application.
The owner can be different from the applicant, builder, tenant, or site contact. Use the details required for the permit application.
Check the owner details against the title, contract, rates notice, or application paperwork.
Enter the person or business lodging the application.
If you lodge applications regularly, save applicant details. Prefilling saved details requires Solo or Team.
Check the applicant is the right contact for council questions and correspondence.
Complete the declaration after every other section is checked.
Check the whole form first. The declaration should only be signed when the application details, owner details, applicant details, and supporting material are ready to lodge.