Skip to content
Tradie Forms
Contact supportOpen app
Tradie Forms
IntroductionQuick startFAQ

Using the app

Form typesWorkspaceJobsStarting a formCompleting a formAI assistantPDF downloadsShare links
Presets
PDF toolsTeamsCustom forms

Form guides

Overview
QLD Form 1QLD Form 11QLD PDR Form 12QLD Form 14QLD Form 19QLD Form 2QLD Form 3QLD Form 5QLD Form 6QLD Form 9

Account and billing

Managing your accountBilling

Support

TroubleshootingFeedback
Section
Section
Page title
Page title
Short description for the help article
Description continues on a second line
Short description for the help article
Description continues on a second line
Intro paragraph
Intro paragraph
Intro paragraph
Intro paragraph
Intro paragraph
Intro paragraph
Section heading
Section heading
Body paragraph
Body paragraph
Body paragraph
Body paragraph
Body paragraph
Body paragraph
Note
Callout title
Callout body
Callout body
Note
Callout title
Callout body
Callout body
Another heading
Another heading
Body paragraph
Body paragraph
Body paragraph
Body paragraph
Body paragraph
Body paragraph
List item one
List item two
List item three
List item one
List item two
List item three
Was this page helpful?
Was this page helpful?
Yes
Yes
No
No

Loading documentation page

On this page
On this page
TOC item
TOC item
TOC item
TOC item
TOC item
TOC item
TOC item
TOC item
TOC item
TOC item

Form guides

QLD Form 1

Overview and section help for Queensland Form 1 permit work applications

QLD Form 1 PDF preview
QLDPlumbing

Queensland Government

Permit work application for plumbing, drainage and on-site sewerage work under the Plumbing and Drainage Regulation 2019.

Open this form

QLD Form 1 is used to apply for permit work for plumbing, drainage, and on-site sewerage work in Queensland.

Tradie Forms follows the form section order and maps your answers to the PDF layout.

Open the form when you have the plans and supporting documents ready.

Before you start

Have these ready:

  • Site street address, lot, plan, tenancy, level, and local government area
  • Permit work type and proposed work details
  • NCC building class and building description
  • Sewered-area and fast-track answers
  • Soil classification and supporting reports where needed
  • Fixture counts and water supply details
  • On-site sewerage or greywater details if relevant
  • Owner and applicant contact details
  • Signature and declaration date

Permit work needs a permit before it starts. Local governments can require supporting documents with the application, depending on the building class and proposed work. Check the current council and Queensland Government requirements before lodging.

After download

  1. Preview the PDF and check it against the plans and supporting reports.
  2. Download it and lodge it with the relevant local government.
  3. Include the required plans, reports, consents, fee and other supporting documents.
  4. Keep the application and lodgement record with the job.

Tradie Forms prepares the PDF. It does not lodge the application, issue the permit or confirm that permit work can start.

Description of Land

Use this section to identify the land covered by the application.

What to enter

  • Street address: full site address
  • Lot and plan: details from title documents, rates notice, survey plan, or development paperwork
  • Shop / tenancy / level: fill these when the work is in a tenancy, unit, or multi-level building
  • Local government area: council area responsible for the application

Tips

On Solo or Team, use address search to start the address, then check the manual fields. Address search will not always know lot, plan, tenancy, or level details.

Before download

Check the site details against the permit paperwork and any plans you are lodging.

Permit Application

Use this section to say what kind of permit work is being applied for.

What to enter

  • Tick each permit work type that applies
  • Describe the proposed plumbing, drainage, or on-site sewerage work
  • Include enough detail for council to understand the scope
  • Note any parts of the work that are staged or limited

Tips

Match the wording to the plans and supporting documents you will lodge. If the work includes water supply and drainage, make sure both are covered.

Before download

Check that the selected work type matches the actual scope and the documents attached to the application.

Building Classification

Enter the National Construction Code building class for the building or structure.

What to enter

  • Select the class or classes that apply
  • Add the building or structure description
  • Use the same class shown in building approval, plans, or project documents where available

Tips

Different supporting documents can apply to different building classes. If you are unsure, confirm with the builder, designer, certifier, or local government before lodging.

Before download

Check the building class against the application documents. A wrong class can lead to wrong supporting paperwork.

Application Type

Use this section to answer the application type questions.

What to enter

  • Whether the premises are in a sewered area
  • Whether the application meets fast-track conditions
  • Any required yes/no answers in Box A or Box B

Tips

Fast-track processing depends on the work and supporting material, not just the checkbox. Check the local government process before relying on fast-track timing.

Before download

Make sure every yes/no answer matches the actual application and attached documents.

Soil Classification

Enter the soil classification when the application requires it.

What to enter

  • Soil class from the site classification report
  • Any relevant note about sanitary drainage design
  • Supporting report details if they help identify the document

Tips

Some soil classes can trigger extra design details, such as articulation for sanitary drainage. Check the application requirements for the job and building class.

Before download

Do not guess the soil class. Use the report or confirm before lodging.

Fixtures to Be Installed

Use this section to count the fixtures to be installed.

What to enter

  • Enter the number beside each fixture type being installed
  • Use zero or leave blank only where the form and your workflow allow it
  • Use the comments section for unusual fixtures or context

Tips

Count from the plans and scope, not memory. If the fixture schedule changes, update the form before lodging.

Before download

Check totals against the plumbing plan and quote.

Water Supply

Use this section to describe the water supply work in the application.

What to enter

  • Select the water supply type that applies
  • Add any required details for domestic, commercial, industrial, fire, or other supply
  • Include context when the work connects to existing services

Tips

Make sure the water supply selection lines up with the permit work type and plans.

Before download

Check water service details against the site plan and any water service provider requirements.

Disposal of Wastewater

Use this section when wastewater disposal details are part of the application.

What to enter

  • On-site sewerage system details where applicable
  • Greywater details where applicable
  • Unsewered area details
  • Treatment plant or disposal field context where needed

Tips

For on-site sewerage work, supporting documents can be important. Check approval and report requirements before lodging.

Before download

Make sure disposal details match the design documents and site conditions.

Comments

Use comments for details that do not fit cleanly in another section.

Good uses

  • Clarifying staged work
  • Explaining unusual fixtures or site conditions
  • Referring to attached reports or plans
  • Adding council reference context

Before download

Keep comments short and specific. Do not use this section to hide missing required information from another section.

Owner Details

Enter the owner details for the application.

What to enter

  • Owner name
  • Postal address
  • Phone and email where known

Tips

The owner can be different from the applicant, builder, tenant, or site contact. Use the details required for the permit application.

Before download

Check the owner details against the title, contract, rates notice, or application paperwork.

Applicant Details

Enter the person or business lodging the application.

What to enter

  • Company or applicant name
  • Contact person
  • Phone and mobile
  • Email address

Saved details

If you lodge applications regularly, save applicant details. Prefilling saved details requires Solo or Team.

Before download

Check the applicant is the right contact for council questions and correspondence.

Declaration

Complete the declaration after every other section is checked.

What to enter

  • Signature
  • Declaration date

Before download

Check the whole form first. The declaration should only be signed when the application details, owner details, applicant details, and supporting material are ready to lodge.

Was this page helpful?

NSW Combined Notice

NSW Combined Notice of Work and Certificate of Compliance - sections, copies, and authority

QLD Form 11

Overview and section help for Queensland Form 11 treatment plant service reports

On this page

Before you startAfter downloadDescription of LandWhat to enterTipsBefore downloadPermit ApplicationWhat to enterTipsBefore downloadBuilding ClassificationWhat to enterTipsBefore downloadApplication TypeWhat to enterTipsBefore downloadSoil ClassificationWhat to enterTipsBefore downloadFixtures to Be InstalledWhat to enterTipsBefore downloadWater SupplyWhat to enterTipsBefore downloadDisposal of WastewaterWhat to enterTipsBefore downloadCommentsGood usesBefore downloadOwner DetailsWhat to enterTipsBefore downloadApplicant DetailsWhat to enterSaved detailsBefore downloadDeclarationWhat to enterBefore download