# QLD Form 1 (/docs/form-guides/plumbing/qld/qld-form-1-permit-work)



**QLD Form 1** is used to apply for permit work for plumbing, drainage, and on-site sewerage work in Queensland.

Tradie Forms follows the form section order and maps your answers to the PDF layout.

[Open the form](/forms/qld-form-1-permit-work) when you have the plans and supporting documents ready.

## Before you start [#before-you-start]

Have these ready:

* Site street address, lot, plan, tenancy, level, and local government area
* Permit work type and proposed work details
* NCC building class and building description
* Sewered-area and fast-track answers
* Soil classification and supporting reports where needed
* Fixture counts and water supply details
* On-site sewerage or greywater details if relevant
* Owner and applicant contact details
* Signature and declaration date

Permit work needs a permit before it starts. Local governments can require supporting documents with the application, depending on the building class and proposed work. Check the current council and Queensland Government requirements before lodging.

<span id="after-export" />

## After download [#after-download]

1. Preview the PDF and check it against the plans and supporting reports.
2. Download it and lodge it with the relevant local government.
3. Include the required plans, reports, consents, fee and other supporting documents.
4. Keep the application and lodgement record with the job.

<Callout type="warn" className="docs-callout-warn my-4">
  Tradie Forms prepares the PDF. It does not lodge the application, issue the permit or confirm that permit work can start.
</Callout>

<span id="description-of-land" />

## Description of Land [#description-of-land]

Use this section to identify the land covered by the application.

### What to enter [#what-to-enter]

* **Street address:** full site address
* **Lot and plan:** details from title documents, rates notice, survey plan, or development paperwork
* **Shop / tenancy / level:** fill these when the work is in a tenancy, unit, or multi-level building
* **Local government area:** council area responsible for the application

### Tips [#tips]

On Solo or Team, use address search to start the address, then check the manual fields. Address search will not always know lot, plan, tenancy, or level details.

### Before download [#before-download]

Check the site details against the permit paperwork and any plans you are lodging.

<span id="permit-application" />

## Permit Application [#permit-application]

Use this section to say what kind of permit work is being applied for.

### What to enter [#what-to-enter-1]

* Tick each permit work type that applies
* Describe the proposed plumbing, drainage, or on-site sewerage work
* Include enough detail for council to understand the scope
* Note any parts of the work that are staged or limited

### Tips [#tips-1]

Match the wording to the plans and supporting documents you will lodge. If the work includes water supply and drainage, make sure both are covered.

### Before download [#before-download-1]

Check that the selected work type matches the actual scope and the documents attached to the application.

<span id="building-classification" />

## Building Classification [#building-classification]

Enter the National Construction Code building class for the building or structure.

### What to enter [#what-to-enter-2]

* Select the class or classes that apply
* Add the building or structure description
* Use the same class shown in building approval, plans, or project documents where available

### Tips [#tips-2]

Different supporting documents can apply to different building classes. If you are unsure, confirm with the builder, designer, certifier, or local government before lodging.

### Before download [#before-download-2]

Check the building class against the application documents. A wrong class can lead to wrong supporting paperwork.

<span id="application-type" />

## Application Type [#application-type]

Use this section to answer the application type questions.

### What to enter [#what-to-enter-3]

* Whether the premises are in a sewered area
* Whether the application meets fast-track conditions
* Any required yes/no answers in Box A or Box B

### Tips [#tips-3]

Fast-track processing depends on the work and supporting material, not just the checkbox. Check the local government process before relying on fast-track timing.

### Before download [#before-download-3]

Make sure every yes/no answer matches the actual application and attached documents.

<span id="soil-classification" />

## Soil Classification [#soil-classification]

Enter the soil classification when the application requires it.

### What to enter [#what-to-enter-4]

* Soil class from the site classification report
* Any relevant note about sanitary drainage design
* Supporting report details if they help identify the document

### Tips [#tips-4]

Some soil classes can trigger extra design details, such as articulation for sanitary drainage. Check the application requirements for the job and building class.

### Before download [#before-download-4]

Do not guess the soil class. Use the report or confirm before lodging.

<span id="fixtures" />

## Fixtures to Be Installed [#fixtures-to-be-installed]

Use this section to count the fixtures to be installed.

### What to enter [#what-to-enter-5]

* Enter the number beside each fixture type being installed
* Use zero or leave blank only where the form and your workflow allow it
* Use the comments section for unusual fixtures or context

### Tips [#tips-5]

Count from the plans and scope, not memory. If the fixture schedule changes, update the form before lodging.

### Before download [#before-download-5]

Check totals against the plumbing plan and quote.

<span id="water-supply" />

## Water Supply [#water-supply]

Use this section to describe the water supply work in the application.

### What to enter [#what-to-enter-6]

* Select the water supply type that applies
* Add any required details for domestic, commercial, industrial, fire, or other supply
* Include context when the work connects to existing services

### Tips [#tips-6]

Make sure the water supply selection lines up with the permit work type and plans.

### Before download [#before-download-6]

Check water service details against the site plan and any water service provider requirements.

<span id="wastewater-disposal" />

## Disposal of Wastewater [#disposal-of-wastewater]

Use this section when wastewater disposal details are part of the application.

### What to enter [#what-to-enter-7]

* On-site sewerage system details where applicable
* Greywater details where applicable
* Unsewered area details
* Treatment plant or disposal field context where needed

### Tips [#tips-7]

For on-site sewerage work, supporting documents can be important. Check approval and report requirements before lodging.

### Before download [#before-download-7]

Make sure disposal details match the design documents and site conditions.

<span id="comments" />

## Comments [#comments]

Use comments for details that do not fit cleanly in another section.

### Good uses [#good-uses]

* Clarifying staged work
* Explaining unusual fixtures or site conditions
* Referring to attached reports or plans
* Adding council reference context

### Before download [#before-download-8]

Keep comments short and specific. Do not use this section to hide missing required information from another section.

<span id="owner" />

## Owner Details [#owner-details]

Enter the owner details for the application.

### What to enter [#what-to-enter-8]

* Owner name
* Postal address
* Phone and email where known

### Tips [#tips-8]

The owner can be different from the applicant, builder, tenant, or site contact. Use the details required for the permit application.

### Before download [#before-download-9]

Check the owner details against the title, contract, rates notice, or application paperwork.

<span id="applicant" />

## Applicant Details [#applicant-details]

Enter the person or business lodging the application.

### What to enter [#what-to-enter-9]

* Company or applicant name
* Contact person
* Phone and mobile
* Email address

### Saved details [#saved-details]

If you lodge applications regularly, save applicant details. Prefilling saved details requires Solo or Team.

### Before download [#before-download-10]

Check the applicant is the right contact for council questions and correspondence.

<span id="declaration" />

## Declaration [#declaration]

Complete the declaration after every other section is checked.

### What to enter [#what-to-enter-10]

* Signature
* Declaration date

### Before download [#before-download-11]

Check the whole form first. The declaration should only be signed when the application details, owner details, applicant details, and supporting material are ready to lodge.
