# Overview (/docs/form-guides/nsw/electrical/nsw-ccew)



The &#x2A;*NSW Certificate of Compliance for Electrical Work (CCEW)** records that electrical installation work meets applicable standards. The official PDF is published by **Building Commission NSW** (template version **2026.1**).

Fill the cert online with the [guided NSW CCEW form](/forms/nsw-ccew), browse [NSW electrical templates](/nsw/electrical), or read workflow articles in the [NSW CCEW resource hub](/resources/forms/nsw-ccew).

## At a glance [#at-a-glance]

|               |                         |
| ------------- | ----------------------- |
| **State**     | NSW                     |
| **Trade**     | Electrical              |
| **Authority** | Building Commission NSW |

## Eight sections [#eight-sections]

Work through these in order on the certificate:

<Cards className="docs-cards docs-cards-cols-2 my-6">
  <Card title="Customer" icon="hugeicons:user" href="/docs/form-guides/nsw/electrical/nsw-ccew/customer">
    Owner and customer address
  </Card>

  <Card title="Installation" icon="hugeicons:map-pin" href="/docs/form-guides/nsw/electrical/nsw-ccew/installation">
    Site, NMI, types of work, network
  </Card>

  <Card title="Equipment" icon="hugeicons:cpu" href="/docs/form-guides/nsw/electrical/nsw-ccew/equipment">
    Load and equipment installed
  </Card>

  <Card title="Meters" icon="hugeicons:gauge" href="/docs/form-guides/nsw/electrical/nsw-ccew/meters">
    Meter install and removal rows
  </Card>

  <Card title="Installer" icon="hugeicons:hard-hat" href="/docs/form-guides/nsw/electrical/nsw-ccew/installer">
    Installer licence and contact
  </Card>

  <Card title="Tester" icon="hugeicons:flask-conical" href="/docs/form-guides/nsw/electrical/nsw-ccew/tester">
    Person who performed testing
  </Card>

  <Card title="Test report" icon="hugeicons:activity" href="/docs/form-guides/nsw/electrical/nsw-ccew/test-report">
    Test date and results
  </Card>

  <Card title="Certification" icon="hugeicons:badge-check" href="/docs/form-guides/nsw/electrical/nsw-ccew/certification">
    Declaration and serial number
  </Card>
</Cards>

## Before you issue the certificate [#before-you-issue-the-certificate]

The form expects:

* Required **customer**, **installation**, **installer**, **tester**, and **certification** fields filled and valid
* At least one **installation type** and one **work carried out** option
* **Installer** licence or qualified supervisor details present
* **Test report** items and date within allowed bounds
* **Meter** details when your work selections require them

Run validation on the full form before generating the PDF.

<Callout type="warn" className="docs-callout-warn my-4">
  Signing the cert is on you. It must match the work on site. Lodgement with Building Commission NSW and the network is your responsibility. Check current NSW requirements before you issue it.
</Callout>

<Cards className="docs-cards docs-cards-cols-2 my-6">
  <Card title="Fill NSW CCEW online" icon="hugeicons:file-check" href="/forms/nsw-ccew">
    Guided form with validation, saved details, and official PDF download.
  </Card>

  <Card title="Best practices" icon="hugeicons:info" href="/docs/form-guides/nsw/electrical/nsw-ccew/best-practices">
    Accuracy, testing workflow, and record-keeping tips.
  </Card>

  <Card title="Common mistakes" icon="hugeicons:alert-circle" href="/docs/form-guides/nsw/electrical/nsw-ccew/common-mistakes">
    Frequent field errors and how to avoid them.
  </Card>

  <Card title="FAQ" icon="hugeicons:help-circle" href="/docs/form-guides/nsw/electrical/nsw-ccew/faq">
    Addresses, same-as-installer, licence search, and validation.
  </Card>
</Cards>
