The **EV Charger Commissioning Record** keeps the charger, circuit protection, commissioning checks, readings, handover, and signatures in one PDF.

This is a Tradie Forms designed record. It is not a certificate of electrical safety and does not choose the correct protection for the installation.

[Open the EV Charger Commissioning Record](/forms/national-ev-charger-commissioning) when the charger is ready for final testing.

<Callout type="warn" className="docs-callout-warn my-4">
  Check the charger instructions and current requirements for the job. Complete
  the electrical compliance certificate required where the work was done.
</Callout>

<span id="before-you-start" />

## Before you start [#before-you-start]

* Have the charger make, model, serial, rating, and installation instructions ready.
* Confirm the supply phases, circuit protection, cable size, RCD type, and load-management setup.
* Have your test equipment and a vehicle or suitable test adapter ready.
* Confirm the app, warranty, isolation, and load-management information to hand over.

<span id="installer" />

## Installer [#installer]

Add the business and installer details shown at the top of the record. Business and installer names are required. Add the ABN, electrical licence, phone, and optional accreditation number where relevant.

The optional logo appears at the top right of the PDF. Save this section on Solo or Team to prefill it next time.

<span id="site" />

## Client and Site [#client-and-site]

Enter the client and commissioning date. Add a contact and job reference, then search the **Site Address** to fill the address, suburb, state, and postcode together.

<span id="system" />

## System [#system]

* Record the charger make, model, serial, rating, and exact install location.
* Choose **Single phase** or **Three phase**.
* Add the circuit protection and cable size.
* Choose the RCD type fitted after checking the charger's built-in DC fault protection.
* Choose **None**, **Static limit**, or **Dynamic load management**.

Create one record per charger on a multi-charger site.

<span id="checklist" />

## Commissioning Checklist [#commissioning-checklist]

Answer all 10 checks with **Yes**, **No**, or **N/A**.

* Use **Yes** when the item was completed and verified.
* Use **No** when the item was not met. Add a short note.
* Use **N/A** only where the item does not apply, such as load management on a charger without it.

The form records the protection and setup you assessed. It does not validate the design.

<span id="readings" />

## Tests and Readings [#tests-and-readings]

Record:

* earth fault loop impedance;
* RCD trip time;
* voltage at the charger; and
* charge test draw during the commissioning session.

Use the units shown by your test equipment so the finished PDF is clear.

<span id="handover" />

## Handover [#handover]

Tick the instructions and documents provided. Confirm whether the customer was briefed and add notes for any follow-up.

The checklist covers operating instructions, app setup, warranty documents, isolation, and load-management behaviour.

<span id="declaration" />

## Declaration and Signatures [#declaration-and-signatures]

Add the installer name, date, and signature. These are required before download.

The customer name and signature are optional. Capture the signature on site, or send the PDF with a share link for later signing.

<span id="final-check" />

## Before download [#before-download]

* Check the charger identity, install location, circuit, cable, RCD, and load-management details.
* Answer all 10 checks and add a note for every No.
* Confirm the four measured readings use clear units.
* Check the handover answers match what the customer received.
* Add the installer name, date, and signature.
* Preview the finished PDF.

<span id="after-download" />

## After download [#after-download]

Give the PDF to the customer and keep a copy with the job, warranty records, test results, and the electrical compliance certificate required where the work was done.